Local News

JOSHUA TREE NATIONAL PARK READY FOR PERSEID METEOR SHOWER

Joshua Tree National Park campgrounds are expected to be fuller during the Perseid Meteor Showers which peak August 9-13. Visitors are welcome to view the showers at various places in the park. Remember camping must be in a campground or in the backcountry by permit. A reminder that Ryan, White Tank and Belle Campgrounds are closed, as are the eastern half Black Rock, Loop B of Cottonwood and the eastern half of Indian Cove. Hidden Valley and Jumbo Rocks are open. Campfires are only allowed in designated campsites provided with fire rings. Road construction is currently underway on the Pinto Basin Road. During the weekdays, travel through the construction zone is by pilot car only. There may be as much as a 30 minute delay. The road construction area is currently dirt and opened during the weekend. In addition to the above campground closures, the closure for the Cottonwood Springs Oasis and trail areas will be continued until further notice. This closure is necessary to allow for remediation of the damage and safety hazards in the area from the September 2013 floods.


Google Ads:
Z107.7 Joshua Tree News - Staff Reporters

Related Posts

1 of 10,058